HSNO Compliance Containment Upgrades
Clients: Various Oil & Gas Sector Clients
Projects have been completed from 2007 to today.
Whitaker Civil Engineering Ltd has successfully completed a number of tank terminal and site facility tank bund
upgrades for their Clients to meet containment requirements for HSNO regulation compliance and certification
Works include civil project management and administration; earthworks demolition; HDPE liner installation; megaflow subsoil
drainage; polyurea membrane application; geotech membrane for embankment stabilization; concrete foundations and structures; stormwater separator systems; retaining walls; kerbing; pavement
construction; chipsealing; concrete paving; and hydroseeding.
The projects require working within the live petrochemical environment with strict adherence to environmental and safety compliance requirements; meeting a stringent schedule and client budget;
and multi-discipline scopes in a brownfield environment.